AppRavens Limited

Load Management

Optimized Load Management

The government plans to revise the ‘Hong Kong Planning Standards and Guidelines’ to require electric vehicle charging facilities in all future new buildings. However, installing these facilities is challenging as buildings must have sufficient electrical capacity. AppRavens’ optimized load management system addresses this by utilizing surplus electricity for charging, eliminating the need for costly capacity expansions.

 

During the day, when electricity demand is higher and surplus power is limited, the optimized load management system reduces charger power, resulting in slower charging. However, since residents typically have fewer charging needs during the day, it doesn’t significantly affect their use of electric vehicles.

At night, when electricity demand is lower, the optimized load management system prioritizes charging electric vehicles by utilizing surplus power without affecting residents’ use of other appliances.

The optimized load management system efficiently controls multiple chargers, accommodating simultaneous charging of multiple electric vehicles. Surplus power is evenly distributed, and chargers stop supplying power when vehicles are fully charged, maximizing electricity utilization for all parking spaces.

Advantages

Contact Us

Address: Room 2B, 7/F, Valley Centre, 80-82 Morrison Hill Road, Wanchai

Office Hours: Mon to Fri 10:00-18:00 (Except bank holidays)

Tel:  26688313

E-mail: cs@appravens.com

Exit mobile version